| InSynch working the difference at the Green House Project. |
Monday, March 12, 2012
Tuesday, February 28, 2012
Rammed Earth 'As Our Ancestors Did It!'
Architects 'Nicholas Whitcutt Architects' contracted InSynch to construct the Rammed Earth walls at the demonstration Centre on Sustainable Living at the Green House Project in Joubert Park, City Centre Johannesburg.
This is TRUE RAMMED EARTH..... no stabiliser needed, the binder is the clay content of the soil, the soil is from site as per the original rammed earth technology dating back nearly 10 000 years.
The walls, as expected have turned out to be rather beautiful, all a single colour but the stratification being very visible, making up classic Rammed Earth.
![]() |
| Alastair & Charles from InSynch in front of one of the walls. |
These walls have been built for YOU to see... go and visit the project!!
Either contact InSynch to arrange the visit for you or contact the Green House Project directly..
Green House Project:
Thursday, February 16, 2012
PV & Wind Grid-Tie - Northcliff JHB
Design and installed a small grid-tied alternative energy system for a client in Northcliff Johannesburg.
The client lives on the North-Eastern slope of Nortcliff Hill, thereby getting a fair quantity of year-through wind, sufficient for the wind turbine, combined with the scalable Photovoltaic (PV) panels to generate an Alternative Power supply into the house supply (DB Board).
The system is designed to out supply the daily load, thereby reducing the overall electricity usage and cost.
The system also makes use on a small battery bank to supply backup power to key loads to the house if there is an ESKOM power failure.
The client lives on the North-Eastern slope of Nortcliff Hill, thereby getting a fair quantity of year-through wind, sufficient for the wind turbine, combined with the scalable Photovoltaic (PV) panels to generate an Alternative Power supply into the house supply (DB Board).
The system is designed to out supply the daily load, thereby reducing the overall electricity usage and cost.
The system also makes use on a small battery bank to supply backup power to key loads to the house if there is an ESKOM power failure.
![]() |
| Marlec Wind Turbine & Tower |
![]() |
| SolarWorld 80W PV panels and SMA SunnyBoy PV Inverter |
Friday, January 27, 2012
Integrated Solar Solutions - One Project - One Supplier
By AM Solar & InSynch
Here we have a project recently completed by AM Solar for a client in the Johannesburg, Kyalami area.
The project consists of a number of related but separate renewable and solar energy solutions including:
Using SolarWorld 260W Panels in Series Strings to generate the power from the sun.
Also a 200L Solar Hot Water (High Pressure) system. All by AM Solar (InSynch Partners).
Note: All Solar Hot Water system used on the project qualified for the ESKOM Rebates.
Solar Power System (15kw Peak):
The Grid-Tied Solar Power system makes use of the following components:
Heat Pumps:
Multiple Heat Pumps were used, all qualified for ESKOM rebates
Biogas System:
In-Situ Cast BioGas system, used for cooking on the plot.
Another Solar Hot Water System used in this project.
Here we have a project recently completed by AM Solar for a client in the Johannesburg, Kyalami area.
The project consists of a number of related but separate renewable and solar energy solutions including:
- Solar Photovoltaic (PV) Power - Medium Scale Residential (15kw Peak)
- Solar Hot Water - incl. various High Pressure & Low Pressure systems.
- Heat Pumps - various size systems on the main house and cottages.
- BioGas System - connected to the main house & cottages.
- Energy Savings - replacement of std lights & fittings to LED & CFL.
Using SolarWorld 260W Panels in Series Strings to generate the power from the sun.
Also a 200L Solar Hot Water (High Pressure) system. All by AM Solar (InSynch Partners).
Note: All Solar Hot Water system used on the project qualified for the ESKOM Rebates.
Solar Power System (15kw Peak):
The Grid-Tied Solar Power system makes use of the following components:
- 3x 5kw Victron Grid-Tied Inverters
- 2x SMA Sunnyboy Inverters (between PV arrays and Grid-Tie)
- 2V Hoppecke Cells (Batteries) for Backup Power.
- On-Line (Web) System Monitoring (Real Time) & Performance Analysis system.
Multiple Heat Pumps were used, all qualified for ESKOM rebates
Biogas System:
In-Situ Cast BioGas system, used for cooking on the plot.
Another Solar Hot Water System used in this project.
The Installation and overall System Design, Project Management and Implementation was done by AM Solar and their partners.
Thursday, November 17, 2011
Progress Photos - Sioc-CDT (Rammed Earth)
This project is unfolding in Kathu in the Northern Cape in South Africa.
InSynch is constructing the Sishan Iron Ore Companies (SIOC) new Head Office's Rammed Earth walls in partnership with the local community and affecting a skills transfer..
Here are some photographs of our progress on site:
InSynch is constructing the Sishan Iron Ore Companies (SIOC) new Head Office's Rammed Earth walls in partnership with the local community and affecting a skills transfer..
Here are some photographs of our progress on site:
Some of the local community Under-Training.
Thursday, October 20, 2011
Friday, October 14, 2011
New InSynch Project Kicks-Off - SIOC-CDT
InSynch has just started on-site with a project that has been in the pipe-line for some time now.
It is the construction of a new Head Office for the Sishan Iron ore Company (SIOC) in partnership with the Community Development Trust (CDT) in Kathu.
Kathu is in the Northern Cape, South Africa.
InSynch's role is as specialist sub-contractor and on-site consultants for the Rammed Earth walls integrated into the building. The project is known as the SIOC-CDT project.
Here is the Architects (Cube Architects) colour impressions of the completed building with the beautiful and very prominent Rammed Earth walls in full view...
More pictures and progress posts on this project to follow...!
It is the construction of a new Head Office for the Sishan Iron ore Company (SIOC) in partnership with the Community Development Trust (CDT) in Kathu.
Kathu is in the Northern Cape, South Africa.
InSynch's role is as specialist sub-contractor and on-site consultants for the Rammed Earth walls integrated into the building. The project is known as the SIOC-CDT project.
Here is the Architects (Cube Architects) colour impressions of the completed building with the beautiful and very prominent Rammed Earth walls in full view...
More pictures and progress posts on this project to follow...!